Wednesday, December 10, 2008

What must be noted that when the renovation of 100 points

First, water and electricity 1, waterproof construction should adopt the water-proof coating 2, waterproofing should be hidden in the construction and completion of the inspection after 3, waterproof construction to be done after the completion of the 2nd water test 4, waterproof bathroom floor should not be less than 1.8 m 5, floor drain, Kok Yin and Yang, to do more local channels, such as a water-proof 6, leakage to use odor to leak 7, cold and hot water pipes left right cold 8, water pipes from the ground as far as possible not to go 9, cold-water pipe in the wall 1CM have a protective coating, hot water pipe is 1.5CM, therefore, open to a deep trough 10, PPR pipe was installed to consider the thickness of the ceramic tiles affixed to a good, so Guanzi will not be exposed 11, cook a few minutes, to vegetables for a long time to buy some big Pelton 12, and leading to matching basin, pretend not to fix up the 13, the toilet can not be used to install cement, to use silica gel 14, toilet, installed after the leader should pay attention to the protection of 15, to consider when buying toilet toilet from the pit 16, to consider the washing machine is on or under the water drainage 17, the bathroom is best not to telephone, easy to damp 18, the bathroom mirror must first consider the good size, or mirror headlights easily mounted on a high 19, the best bathroom pipes to stay manholes 20, the strong weak power can not wear a pipe at the same 21, left zero, right on the ground with 22, to 300 from the power outlet, switch 1.4 m 23, do not switch mounted on the back door 24, the outlet should be a lot of good 25, 16A with high-power electrical sockets, such as electric ovens, etc. 26, cassette good use 27, cassette and the panel must be coordinated, or else they might not installed on 28, PVC pipe cable wire cross-section area of no more than wire tube cross-section area of 40% 29, not air-conditioned bedroom on the implantation 30, to consider air-conditioning hole tilted outward, or else the rain will come in 31, Light far as possible to consider dual control 32, the best installation Bathroom splash outlet 33, to consider a balcony outlet 34, groove to horizontal wire-vertical, as well row, after using up to facilitate 35, utilities mounted to the flue valve Zhini 36, bought electrical appliances must allow workers to see a good statement 37, manual and warranty card information must remain good Second, Nigong 38, the cement factory over a period of three months can not be used 39 different species, grade cement can not be mixed 40, yellow sand must use river sand, mouth taste will know 41, tile water to more than two hours, before dried paste 42, the tile would rather buy a few films, do not buy less, or prone to chromatic aberration 43, the wall can not have two rows of the entire non-brick 44, wiping immediately after the completion of the seam on the tile to carry out clean-up 45, affixed to the marble floor (light), the stone on the back of waterproofing to be done 46, Yang corner to cut 45-degree angle 47, floor tiles to the floor drain tilt Department, or vulnerable to water 48, the pipe wall across the mouth used to cut package in the form of this appears to block or brick 49, the ground should be dry marble shop 50, floor tiles must Naizang, non-slip, not just to look good 51, matt tiles difficult to clean up 52, the balcony floor tiles should pay attention to the direction of drainage Third, carpentry 53, the keel to the best use of drying larch 54, the wooden plate will be bought later saw air-dry 55, the first shell house carpentry approach the horizon 56, the color panel to come in to buy a paint brush again, was to prevent dirty 57, ceiling fans can not be mounted on the ceiling keel 58, the construction of the color panel to pre-select color 59, tendons hanging from the ceiling of the wall not to be more than 300 60, gypsum board used since the first attack, Shen screws into the plate surface 1 ~ 2MM, and to do to deal with rust-proof and can not nail gun 61, the plasterboard nails shall not be greater than the distance between 200 62, with gypsum board walls have cracks 3MM for dealing with crack 63, gypsum board corner Yang Yang to do the best protection angle Article 64, up and down the wooden doors of the emerging Department to paint brush 65, Mentao toilet brush to look at the bottom of the water 66, the size of the door should be consistent 67, wood furniture, try not to do so, can be done to do the 68, as far as possible to buy the whole of the cabinet, woodworking done, we can not design 69, in a certain size to be considered, up to more trouble 70, their doors will not move to do so dark track, not after maintenance 71, a small bathroom, then moved to do as much as possible the door, do not open the door, or local 72, not sure of the wood must live with the foreman and more exchanges should not be given a free hand so that they 73, in the hands of the money is the last word 74, with children at home, using less glass 75, must let the workers make good look at drawings 76, useful in the kitchen drawer 77, the keel wood floor flatness is 5MM 78, the gross floor paved to 30 degrees or 45 degrees between the board and the board to stay 2 ~ 3MM, to stagger the joints 79, on the floor between the wall and had to stay 8 ~ 10MM cracks 80, the composite floor over the length of time to consider the expansion joints 8M 81, to minimize the use of MDF do Mentao 82, hinges and hardware must be good 83, Yuba to be mounted on wood keel, can not be directly mounted on the ceiling Fourth, painter 84, medium-dark latex paint as much as possible during the construction of Water not otherwise prone to chromatic aberration 85, the plasterboard seams to be a bandage on 86, the gap where the walls are really cool to be on the cloth is better 87, some of the original wall putty for the Eradication of the best, or glue brush again Fenggu 88, as far as possible to buy well-known brand of paint, decoration or recommended by the company recommended by the foreman did not use well-known ones as far as possible 89, the weather is too humid, not to paint brush 90, painting, grinding the paint to dry completely, and so on after 91, a paint under construction, and so on must be a former paint dry after 92, the metal surface of the painting to be done to deal with rust 93, the weather is too cold, the paint will be poor construction quality 94, paint the door when the United States to use paper patterns posted stay hinges and locks 95, hot days, it is necessary to pay attention to ventilation 96, wallpaper paste, to brush the wall Qingyou 97, wallpaper paste, we should switch, the panel outlet to unload 98, light, latex paint Mercerized to the completion of the first, prone to make up the difference 99, skirting board installed after the putty to use latex paint and sewing up like 100, use frosted glass to protect newspapers

No comments: